Migration Methodology

Complete end-to-end methodology for successful FGA migration with proven phases, timelines, and success criteria

FGA Migration Methodology

Authonomy’s proven 6-phase migration methodology has successfully guided organizations through complex authorization modernization projects. This systematic approach minimizes risk, ensures business continuity, and delivers measurable results.

Overview: The 6-Phase Journey

graph LR
    A[Phase 1
Discovery] --> B[Phase 2
Translation] B --> C[Phase 3
Infrastructure] C --> D[Phase 4
Testing] D --> E[Phase 5
Rollout] E --> F[Phase 6
Optimization] A -.-> G[Continuous
Monitoring] B -.-> G C -.-> G D -.-> G E -.-> G F -.-> G

Total Duration: 12-16 weeks for typical enterprise deployment Success Rate: 100% with proper methodology adherence Average ROI: 300-500% within first year

Phase 1: Discovery & Assessment (2-3 weeks)

🎯 Objectives

  • Map complete authorization landscape
  • Assess migration complexity and effort
  • Identify quick wins and potential blockers
  • Establish success criteria and KPIs

πŸ“‹ Key Activities

Week 1: Automated Discovery

  • Deploy discovery agents across development and staging environments
  • Scan applications, databases, and configuration files
  • Generate initial authorization landscape map
  • Conduct stakeholder interviews to understand business requirements

Week 2: Analysis & Planning

  • Analyze discovery results and complexity scores
  • Create detailed migration roadmap and effort estimates
  • Identify pilot systems for initial migration
  • Design success metrics and validation criteria

🎯 Success Criteria

  • Complete authorization landscape documented
  • Migration complexity assessment completed
  • Pilot systems selected and prioritized
  • Stakeholder buy-in achieved for migration approach

πŸ“Š Deliverables

  • Authorization landscape visualization
  • Migration complexity report
  • Effort estimation and timeline
  • Risk assessment and mitigation plan

Sample Timeline:

Phase 1 Schedule:
  Week 1:
    Days 1-2: Deploy discovery agents
    Days 3-4: Initial scans and data collection
    Day 5: Stakeholder interviews
    
  Week 2:  
    Days 1-2: Analysis and complexity scoring
    Days 3-4: Migration planning and roadmap creation
    Day 5: Stakeholder review and approval

Phase 2: Policy Design & Translation (3-4 weeks)

🎯 Objectives

  • Convert legacy authorization to FGA policies
  • Validate business logic preservation
  • Design optimized policy models
  • Prepare for testing and validation

πŸ“‹ Key Activities

Week 1-2: Policy Translation

  • Extract authorization logic from legacy systems
  • Convert RBAC, hardcoded permissions to FGA format
  • Handle complex business rules and edge cases
  • Create policy templates for reusable patterns

Week 3: Business Validation

  • Review translated policies with business stakeholders
  • Validate business logic preservation and enhancement opportunities
  • Refine policies based on stakeholder feedback
  • Document policy rationale and business context

Week 4: Policy Optimization

  • Optimize policies for performance and maintainability
  • Create policy versioning and management strategy
  • Prepare policy deployment packages
  • Design policy rollback and recovery procedures

🎯 Success Criteria

  • All legacy authorization logic translated to FGA policies
  • Business stakeholder validation completed
  • Policy performance benchmarks met
  • Policy management and versioning strategy defined

πŸ“Š Deliverables

  • Complete FGA policy set for pilot systems
  • Business logic validation reports
  • Policy performance analysis
  • Policy management procedures

Sample Translation Output:

# Example policy translation summary
translation_summary:
  systems_covered: 8
  policies_created: 24
  business_rules_preserved: 156
  performance_benchmark:
    evaluation_time_p95: "< 25ms"
    cache_hit_rate: "> 85%"

Phase 3: Infrastructure Setup (2-3 weeks)

🎯 Objectives

  • Deploy enforcement infrastructure
  • Configure monitoring and alerting
  • Establish synchronization architecture
  • Prepare testing environment

πŸ“‹ Key Activities

Week 1: Infrastructure Deployment

  • Deploy chosen enforcement methods (gateway, proxy, library)
  • Configure high availability and redundancy
  • Set up policy management and distribution
  • Configure network security and access controls

Week 2: Integration & Configuration

  • Integrate with identity providers and user directories
  • Configure synchronization between enforcement methods
  • Set up comprehensive monitoring and alerting
  • Configure audit logging and compliance reporting

Week 3: Testing Environment

  • Prepare production-like testing environment
  • Configure shadow mode testing capabilities
  • Set up automated testing and validation frameworks
  • Conduct infrastructure testing and validation

🎯 Success Criteria

  • All enforcement infrastructure deployed and operational
  • High availability and failover tested
  • Monitoring and alerting operational
  • Shadow mode testing ready for production

πŸ“Š Deliverables

  • Production-ready enforcement infrastructure
  • Comprehensive monitoring dashboards
  • Infrastructure documentation and runbooks
  • Testing framework and validation procedures

Phase 4: Shadow Mode Testing (2-3 weeks)

🎯 Objectives

  • Validate FGA policies in production environment
  • Compare legacy vs. FGA authorization decisions
  • Identify and resolve policy gaps
  • Build confidence for enforcement rollout

πŸ“‹ Key Activities

Week 1: Initial Shadow Testing

  • Enable shadow mode for pilot systems
  • Begin collecting authorization decision comparisons
  • Monitor for policy evaluation errors or performance issues
  • Initial analysis of decision agreement rates

Week 2: Policy Refinement

  • Analyze discrepancies between legacy and FGA decisions
  • Refine policies to address gaps and edge cases
  • Re-test refined policies and validate improvements
  • Expand shadow testing to additional systems

Week 3: Validation & Sign-Off

  • Achieve target decision agreement rates (typically >99.5%)
  • Complete performance validation and optimization
  • Conduct security review and penetration testing
  • Obtain stakeholder approval for enforcement rollout

🎯 Success Criteria

  • Decision agreement rate >99.5% for all pilot systems
  • Performance impact <5% baseline increase
  • Zero critical security or functionality gaps identified
  • Stakeholder approval obtained for enforcement phase

πŸ“Š Deliverables

  • Shadow testing validation report
  • Policy refinement documentation
  • Performance analysis and optimization recommendations
  • Security assessment and approval

Sample Shadow Test Results:

Shadow Testing Summary - Week 3:
  total_requests: 1,250,000
  decision_agreement: 99.7%
  performance_impact: 3.2%
  critical_issues: 0
  
  discrepancies_resolved:
    - admin_override_scenarios: 12 cases
    - temporal_access_rules: 8 cases  
    - cross_system_dependencies: 5 cases

Phase 5: Gradual Rollout (3-4 weeks)

🎯 Objectives

  • Incrementally enable FGA policy enforcement
  • Monitor system stability and user experience
  • Maintain rollback readiness
  • Achieve full enforcement coverage

πŸ“‹ Key Activities

Week 1: Pilot Enforcement (5-10% traffic)

  • Enable enforcement for selected user groups or low-risk operations
  • Monitor closely for any issues or unexpected behavior
  • Validate rollback procedures and response times
  • Fine-tune performance and caching based on real traffic

Week 2: Expanded Rollout (25-50% traffic)

  • Gradually increase enforcement coverage
  • Monitor user experience and support ticket volume
  • Continue performance optimization and policy refinement
  • Validate that all stakeholder success criteria are being met

Week 3-4: Full Enforcement (100% traffic)

  • Complete rollout to all users and systems
  • Monitor for stability and performance at full scale
  • Begin legacy system decommission planning
  • Document lessons learned and best practices

🎯 Success Criteria

  • Full enforcement achieved without service disruption
  • User experience impact <2% (measured via support tickets)
  • System performance within acceptable ranges
  • No security incidents or authorization bypass attempts

πŸ“Š Deliverables

  • Production enforcement deployment
  • Performance monitoring dashboards
  • User experience impact analysis
  • Rollout success metrics and lessons learned

Rollout Schedule Example:

Rollout Schedule - Customer Portal:
  Week 1: 5% β†’ 10% of users
    Monday: Internal employees (5%)
    Wednesday: Beta customers (10%)
    Friday: Performance review and optimization
    
  Week 2: 25% β†’ 50% of users  
    Monday: Small business customers (25%)
    Wednesday: Mid-market customers (50%)
    Friday: Full system validation
    
  Week 3: 100% of users
    Monday: Enterprise customers (100%)
    Daily: Continuous monitoring and optimization

Phase 6: Full Migration & Optimization (2-3 weeks)

🎯 Objectives

  • Complete legacy system decommission
  • Optimize policy performance and maintainability
  • Establish ongoing operations procedures
  • Measure and report migration success

πŸ“‹ Key Activities

Week 1: Legacy Decommission

  • Remove legacy authorization code and infrastructure
  • Archive historical authorization data for compliance
  • Update documentation and system architecture diagrams
  • Train operations team on new FGA infrastructure

Week 2: Performance Optimization

  • Fine-tune policy caching and evaluation performance
  • Optimize synchronization patterns and batch sizes
  • Review and consolidate monitoring and alerting rules
  • Conduct load testing at projected peak capacity

Week 3: Operations Handoff

  • Complete operations team training and documentation
  • Establish ongoing policy management procedures
  • Set up automated policy testing and deployment pipelines
  • Conduct migration retrospective and success measurement

🎯 Success Criteria

  • Legacy authorization infrastructure fully decommissioned
  • FGA policies optimized for production performance
  • Operations team trained and ready for ongoing management
  • Migration ROI documented and validated

πŸ“Š Deliverables

  • Fully optimized FGA authorization infrastructure
  • Complete operations documentation and procedures
  • Migration success report and ROI analysis
  • Ongoing maintenance and optimization plan

Success Metrics & KPIs

πŸ“ˆ Technical Metrics

  • Authorization Decision Latency: Target <10ms p95
  • System Uptime: Target >99.9% availability
  • Policy Coverage: 100% of access decisions under FGA control
  • Sync Consistency: >99.9% consistency across enforcement methods

πŸ’Ό Business Metrics

  • Development Velocity: 40-60% faster authorization feature development
  • Security Incidents: 70-90% reduction in authorization-related incidents
  • Compliance Audit Time: 50-80% reduction in audit preparation time
  • Operational Overhead: 30-50% reduction in authorization maintenance effort

🎯 Migration-Specific Metrics

  • Migration Timeline: Delivered within planned schedule
  • Scope Completion: 100% of identified systems migrated
  • Quality Metrics: Zero post-migration security incidents
  • User Impact: <2% increase in support tickets during migration

Risk Management

⚠️ Common Risks & Mitigation

Risk: Policy translation errors lead to incorrect authorization decisions Mitigation: Comprehensive shadow mode testing with >99.5% agreement threshold

Risk: Performance degradation during enforcement rollout
Mitigation: Gradual rollout with automatic rollback triggers and performance monitoring

Risk: Legacy system dependencies not fully understood Mitigation: Extended discovery phase with stakeholder validation and dependency mapping

Risk: Business stakeholder resistance to authorization changes Mitigation: Early stakeholder engagement, clear communication of benefits, and pilot program success demonstration

πŸ›‘οΈ Failure Recovery Procedures

  • Instant rollback: <30 seconds to revert to legacy authorization
  • Partial rollback: Selective rollback of specific systems or user groups
  • Data recovery: Restore authorization state from backups if needed
  • Incident response: 24/7 support during critical migration phases

Organizational Readiness

πŸ‘₯ Required Team Composition

  • Executive Sponsor: Ensure organizational commitment and resource allocation
  • Technical Lead: Oversee technical implementation and architecture decisions
  • Security Lead: Validate security requirements and policy correctness
  • Business Analyst: Ensure business logic preservation and stakeholder alignment
  • Operations Lead: Plan production deployment and ongoing operations

πŸ“š Training & Knowledge Transfer

  • Policy Management: Train team on FGA policy creation and maintenance
  • Operations Procedures: Handoff infrastructure management and monitoring
  • Incident Response: Prepare team for authorization-related incidents
  • Business Process: Update authorization request and approval workflows

Quality Gates

Each phase has defined quality gates that must be passed before proceeding:

Phase 1 β†’ Phase 2

  • Complete authorization discovery with <5% unknown systems
  • Stakeholder agreement on migration scope and approach
  • Resource allocation confirmed for full project

Phase 2 β†’ Phase 3

  • 100% of legacy authorization logic translated to FGA policies
  • Business stakeholder validation completed
  • Policy performance benchmarks achieved

Phase 3 β†’ Phase 4

  • All enforcement infrastructure deployed and operational
  • Shadow mode testing capabilities validated
  • Monitoring and alerting fully functional

Phase 4 β†’ Phase 5

  • Shadow testing achieving >99.5% decision agreement
  • Performance impact <5% of baseline
  • Security review completed with no critical findings

Phase 5 β†’ Phase 6

  • Full enforcement rollout completed successfully
  • User experience impact within acceptable ranges
  • System stability maintained throughout rollout

Customization for Your Environment

🏒 Enterprise Considerations

  • Compliance requirements: Extended validation for regulated industries
  • Change management: Formal approval processes and documentation
  • Risk tolerance: More conservative rollout schedules for critical systems
  • Resource constraints: Adjusted timelines based on team availability

πŸš€ Startup/Scale-up Adaptations

  • Accelerated timeline: Compressed phases for faster iteration
  • Resource optimization: Focus on automation and self-service capabilities
  • Growth preparation: Design policies for anticipated scaling requirements
  • Technical debt: Address authorization debt while building new capabilities

🌐 Multi-Region Deployments

  • Regional rollout: Phase rollout by geographic region
  • Data sovereignty: Comply with regional data protection requirements
  • Latency optimization: Regional FGA service deployment
  • Compliance variation: Handle different regulatory requirements by region

Success Stories & Lessons Learned

πŸ† Typical Results

  • Migration Timeline: 12-16 weeks end-to-end
  • Application Changes: Zero code changes for 80-90% of systems
  • Performance Impact: <5% latency increase, often with improvements
  • Security Improvement: 70-90% reduction in authorization-related incidents

πŸ“š Key Lessons

  • Stakeholder engagement is critical: Early and ongoing business stakeholder involvement prevents scope creep and ensures success
  • Shadow testing is invaluable: Most policy issues are discovered and resolved during shadow mode
  • Performance planning matters: Proper caching and optimization planning prevents rollout delays
  • Gradual rollout reduces risk: Incremental enforcement rollout catches edge cases safely

Getting Started

πŸš€ Immediate Next Steps

  1. Conduct readiness assessment: Evaluate organizational readiness for FGA migration
  2. Assemble migration team: Identify and commit key stakeholders and technical resources
  3. Define success criteria: Establish clear, measurable goals for the migration project
  4. Plan discovery phase: Schedule initial discovery and assessment activities

πŸ“ž Professional Services

Consider Authonomy Professional Services for:

  • Migration planning and project management
  • Custom policy development for complex business rules
  • Performance optimization and architectural guidance
  • Training and knowledge transfer for your team

🎯 Quick Assessment Questions

Use these questions to determine your migration readiness:

Technical Readiness

  • Do you have a complete inventory of systems requiring authorization migration?
  • Is your team familiar with Fine-Grained Authorization concepts and benefits?
  • Do you have sufficient development and operations resources for a 12-16 week project?

Organizational Readiness

  • Is there executive commitment to authorization modernization?
  • Are business stakeholders willing to participate in policy validation?
  • Do you have clear compliance and security requirements for authorization?

Timeline & Resources

  • Can you commit dedicated resources for the migration project duration?
  • Is there flexibility in timeline if unexpected complexity is discovered?
  • Do you have budget for professional services if needed?

ROI Calculation

πŸ’° Cost Savings

  • Reduced development time: 40-60% faster authorization feature development
  • Lower security incident costs: Prevent authorization-related breaches
  • Compliance efficiency: Faster audit preparation and reporting
  • Operational overhead: Reduced maintenance and troubleshooting

πŸ“ˆ Revenue Enhancement

  • Faster enterprise sales: Streamlined compliance and security demonstrations
  • Product differentiation: Advanced authorization as competitive advantage
  • Customer trust: Enhanced security posture builds customer confidence
  • Market expansion: Meet authorization requirements for new verticals

⏱️ Time to Value

  • Quick wins visible: 2-4 weeks (after shadow testing begins)
  • Measurable improvements: 6-8 weeks (during gradual rollout)
  • Full ROI realization: 6-12 months (post-migration optimization)

Support & Success Resources

πŸ“ž Migration Support

  • Dedicated migration specialists: Expert guidance throughout the process
  • 24/7 technical support: During critical migration phases
  • Emergency rollback assistance: Immediate support if issues arise
  • Post-migration optimization: Ongoing performance and policy optimization

πŸ“š Learning Resources

  • FGA best practices guide: Advanced policy design patterns
  • Performance optimization handbook: Tuning and scaling guidance
  • Compliance mapping: Regulatory requirement implementation guides
  • Team training materials: Comprehensive education for your organization

Conclusion

Successful FGA migration requires careful planning, systematic execution, and ongoing optimization. Authonomy’s proven methodology provides the framework, while our comprehensive platform provides the technology and professional services provide the expertise.

The result: Modern, maintainable authorization infrastructure that enhances security, improves compliance, and accelerates developmentβ€”all without the massive rewrite.


Ready to start your FGA migration journey? Begin with a discovery assessment or schedule a methodology consultation with our migration experts.